Discover our latest projects

Standardising instruments for Envirocleanse

Envirocleanse: Standardising instrumentation for skids containing ship ballast water chlorination and dechlorination

View Project

Process Instrument Solutions supplied and installed the Siemens Milltronics WD600 for a vegetable packing plant in East Anglia.

Siemens Milltronics WD600 for a vegetable packing plant in East Anglia

Process Instrument Solutions supplied and installed the Siemens Milltronics WD600 for a vegetable packing plant...

View Project

Fox Thermal FT1 flowmeter Biogas to Grid

Fox Thermal FT1 Mass Flowmeter on a Biogas to Grid

Process Instrument Solutions were assigned the task of supplying and installing the industry leading Fox...

View Project

Magnetic Flowmeters Pressure Gauges

Hygienic Magnetic Flowmeters and Hygienic Pressure Gauges for a major food and beverage manufacturer

Process Instrument Solutions was approached by a major food and beverage manufacturer in the Eastern...

View Project

Siemens PS2 Digital Positioner

Siemens PS2 Digital Positioner used on feedwater valve

A large power producer in the northeast US has a four unit power generation plant...

View Project

sewerage services to drinking water

The journey of sewerage services to drinking water supply

The Saalfeld-Rudolfstadt Assocation is commited to supply around 82,000 inhabitants in Germany with safe and...

View Project

Siemens Instrumentation used in milling process

Carr’s Flour is one of the most established mills and has three sites across the...

View Project

UK chemical manufacturer

Supply of 108 Bürkert Ball Valves, Pilot Solenoids and Actuators

Process Instrument Solutions was tasked with providing valves for delivery and off-load of raw materials...

View Project

Hygenic temperature measurement with Thermowells

Hygenic temperature measurement with Thermowells

The German manufacturer Labom has supplied its patented clamp- on solution as a non-invasive alternative...

View Project

Chemical Storage Tank Volume

Chemical Storage Tank Volume

A plant required a new local display of contents of chemical storage tanks. The IP65-NEMA...

View Project

Fruit syrup production process

Fruit syrup production process is sweeter thanks for smart valve control

The project scope set by Teisseire, the leading French producer of fruit syrups and soft...

View Project

pilot brewery automation technology

Innovative pilot brewery automation technology for Weihenstephan – Cooperation with ATN GmbH

The pilot brewery of Weihenstephan’s research centre for brewery and food quality is at the...

View Project

Safe operation with overpressure

Safe operation with overpressure

E.L.B. EX-GERÄTE Bachmann GmbH based in Bensheim, Germany are specialists in offering an extensive range...

View Project

Steeps Overflow Solution Implemented by Process Instrument Solutions for a Multinational Malting Company

Steeps Overflow Solution Implemented by Process Instrument Solutions for a Multinational Malting Company

View Project

Clearwell Level Instrumentation at Water Treatment Plant

Clearwell Level Instrumentation at Water Treatment Plant

Clearwell level control instrumentation was in need of some modernisation. The previous Foxboro mechanical pump...

View Project

Diaphragm Seal for Difficult Media Modular System

Diaphragm Seal for Difficult Media Modular System with Patented Diaphragms

This particular case study highlights diaphragm seal options for difficult modular systems with patented diaphragms...

View Project

Flow Meter Calibration

Thermal Flow Meter Calibration Gas Service

This case study looks at the importance of gas composition and calibration and their effects...

View Project

Volume Measurements

Volume Measurements at Water Treatment Plant

This case study looks at a water treatment plant which was using older ultrasonic level...

View Project

Diaphragm seal

Active Compensation of the Temperature Sensor with Diaphragm Seal Systems

Diaphragm seals are frequently used in the process industry for pressure measurements to protect the...

View Project

British Sugar

British Sugar Newark; Refined sugar section valve control upgrade project

In 2018 we were asked to survey the valve positioners & switch boxes that were...

View Project

Flow measurement of hydrogen

Flow measurement of hydrogen for combustion applications

A request to measure the mass flow of gas was made by a renowned gas...

View Project

Energy Metering

Guildhall Art Gallery (City of London) Energy Metering Solution

As part of a responsible energy usage initiative, we were approached by the City of...

View Project

hydrogen-fired

World’s first hydrogen-fired clay brick trial

Michelmersh Brick Holdings PLC is Britain’s clay product specialist with over 125 million clay bricks...

View Project

Will your pressure sensor fail after some time of being exposed to hydrogen?

Will your pressure sensor fail after some time of being exposed to hydrogen?

Labom decided to use a scientific approach and enlisted leading experts Dr. Schweder and Dr....

View Project

ECO2 Low carbon farming heat meter verifications

Our client is the asset manager of two giant low carbon greenhouse, the first of...

View Project

monitoring system

Straw Line Bale monitoring system

We were commissioned by the client to design and implement a comprehensive solution aimed at...

View Project

Enhancing Environmental Compliance through Innovative Water Measurement Solution

Enhancing Environmental Compliance through Innovative Water Measurement Solutions

Our client, a prominent water treatment facility, approached us seeking assistance in addressing challenges related...

View Project

Water metering and usage analysis for maltings company

Water metering and usage analysis for maltings company

Process Instrument Solutions was contacted by a prominent maltings company to address their water metering...

View Project

Beverage Filling Machine Wireless Bridge Application

Beverage Filling Machine Wireless Bridge Application

Our team was approached with a challenging task: to devise a slip ring replacement solution...

View Project

Replacement solution for an aging fleet of Biological Oxygen Demand analysers

Replacement solution for an aging fleet of Biological Oxygen Demand analysers

We were assigned the task of devising a replacement solution for outdated BOD analysers crucial...

View Project

Final instrumentation commissioning of a leading global ingredients manufacturer

Final instrumentation commissioning of a leading global ingredients manufacturer

As part of a leading global ingredients manufacturer, specialising in high-quality natural extracts and flavourings...

View Project

Site-Wide Instrument Calibration at Rookery South Energy-from-Waste (EfW) Power Station

Site-Wide Instrument Calibration at Rookery South Energy-from-Waste (EfW) Power Station

Rookery South Energy Recovery Facility (ERF) is a cutting-edge plant designed to process up to...

View Project

Liebherr P78 Moisture Monitoring on Digestate Dryers

Liebherr P78 Moisture Monitoring on Digestate Dryers

Process Instrument Solutions supplied and commissioned a Liebherr P78 moisture monitoring system at a digestate...

View Project

MCERTS approved Flow Meter for stack flow discharge

Our customer had recently won a project to upgrade the boiler house discharge stack at...

View Project

Precision Dosing in Animal Feed Production with Siemens Coriolis Meters

Precision Dosing in Animal Feed Production with Siemens Coriolis Meters

Process Instrument Solutions has a long-standing relationship with a leading animal feed mill, supplying three...

View Project

Reliable Process Instrumentation Supporting Carbon Reduction Initiatives

Reliable Process Instrumentation Supporting Carbon Reduction Initiatives

Process Instrument Solutions recently supported a customer involved in a carbon capture project, supplying a...

View Project

Intelligent Valve Control for Carbon Capture in Cement Production

Intelligent Valve Control for Carbon Capture in Cement Production

Process Instrument Solutions recently partnered with Valve Solutions Ltd to deliver a package of instrumentation...

View Project

Reliable Flow Monitoring for Mobile Irrigation and Dosing Stations

Reliable Flow Monitoring for Mobile Irrigation and Dosing Stations

Our friends, 4i Water Services, recently developed a mobile solution to support arable farming by...

View Project

Fast-Track Meter Run Delivery for Oil & Gas in the UAE

Fast-Track Meter Run Delivery for Oil & Gas in the UAE

Process Instrument Solutions recently completed the supply of two meter runs for an oil and...

View Project

Precision Digital Consolidators and Siemens Radar Improve Feedmill Silo Monitoring

Precision Digital Consolidators and Siemens Radar Improve Feedmill Silo Monitoring

Process Instrument Solutions recently supplied and installed a Precision Digital Consolidator multi-channel indicator system at...

View Project

Siemens CLS200 Capacitance Switches Enhance Level Control at Wastewater Plant

Process Instrument Solutions supplied, installed and commissioned Siemens SITRANS CLS200 digital high-level capacitance switches at...

View Project

Complete weighing solution for a quarry operation

Complete weighing solution for a quarry operation

Process Instrument Solutions were contracted to supply, install and commission a complete weighing solution for...

View Project

Accurate Level Monitoring in Obstructed Sump Applications

The Solutions team completed the installation and commissioning of a Siemens SITRANS LT500 HART-enabled transmitter/controller...

View Project

Specialist Installation of Siemens Level Switches on HCL Tanks

Specialist Installation of Siemens Level Switches on HCL Tanks

Our site engineers completed a specialist project involving the installation of two Siemens Pointek CLS300...

View Project

Seamless Flowmeter Calibration and Reinstallation

Seamless Flowmeter Calibration and Reinstallation for a UK Facility

Our Service team was recently tasked with completing a flowmeter project for a UK-based facility....

View Project

Service in the Snow to keep the Gas Flow

Service in the Snow to keep the Gas Flow

Our Project & Site Services Manager, Craig Hamman, attended a customer site to oversee the...

View Project

DSEAR-Compliant Level Instrumentation Upgrade at Anaerobic Digester Plant

In early 2023, an Anaerobic Digester plant required an upgrade to its level measurement instrumentation...

View Project

Early Gas Detection via Differential Flow Automation on the Flowline Mini Rig

Early Gas Detection via Differential Flow Automation on the Flowline Mini Rig

The Customer (Anglo American) approached our customer (Flowline) and requested the ability to monitor the...

View Project

Enabling Innovative Carbon Capture Technology

Process Instrument Solutions were approached by an established UK manufacturer to aid their capabilities in...

View Project

High-Temperature Thermowell Upgrade for Biomass Plant

A straw-fired biomass power station in Cambridgeshire was experiencing ongoing reliability issues with temperature measurement...

View Project

Instrumentation on a Premier Gasification Project

Process Instrument Solutions recently secured a major project to supply instrumentation for a large UK-based...

View Project

In-Line Brix Measurement Upgrade for Jam Production Using KxS Refractometer

Process Instrument Solutions was approached by a premier supplier of processing equipment for the UK...

View Project

East Midlands Airport Improves Flow Monitoring Accuracy Across Surface Water Ponds

East Midlands Airport Improves Flow Monitoring Accuracy Across Surface Water Ponds

View Project

Precision Airflow Control for Barley Steeps

Process Instrument Solutions was approached to improve air circulation control within several barley steeps used...

View Project

Secure Data Logging Solution for BS EN IEC 60060-2 Compliance

Process Instrument Solutions was approached by a major UK manufacturer of high-voltage cable jointing and...

View Project

Carbon Capture Gas Analyser System

Process Instrument Solutions were approached to provide a complete suite of instrumentation, valves and gas...

View Project

High Accuracy Gas Flow Measurement

High Accuracy Gas Flow Measurement

A major gas-fired power station required the replacement of ageing differential pressure transmitters installed on...

View Project

Supporting UAE Oil & Gas Separator Manufacturers with Faster Delivery and Improved Customer Support

The United Arab Emirates is a major hub for oil and gas separator manufacturing, where...

View Project

Siemens SITRANS FX330 Steam Flow Meter

Steam Flow Measurement on a Heating Distribution Hub

View Project

Boiler steam flow measurement

Steam Usage Monitoring on a Large Factory Boiler

A large manufacturing facility required accurate measurement of steam consumption to better understand both overall...

View Project

Steam Emergency Shut-Off Valve

Intelligent Valve Positioning Solution for a Critical Steam Emergency Shut-Off Valve

A major gas-fired power station required a robust and reliable actuation solution for a large...

View Project

Reliable Valve Position Control in a Challenging Chemical Application

Process Instrument Solutions was approached by a local chemical manufacturer to provide a robust valve...

View Project

Dual Stilling Tube Level Measurement & On-Line Verification for Turbine Blow-down Condensate Pot

View Project