March Monthly Update
29 March 2021
Product of the Month
Siemens Sitrans LR100 Series https://www.processinstrumentsolutions.co.uk/search/?keyword=lr1
Winner of the Engineers choice awards for Sensors/ Transmitters category
SITRANS LR100 series are 80 GHz compact radar transmitters with Bluetooth wireless technology. Featuring a narrow beam for flexible installations in existing vessel openings – or non-intrusively through plastic vessels
Siemens Sitrans LR120 http://www.pisales.co.uk/store/Level/level-transmitters/Radar/Siemens-SITRANS-LR120
Siemens Sitrans LR140 http://www.pisales.co.uk/store/Level/level-transmitters/Radar/Siemens-SITRANS-LR140
Special Offer
Müller Screw-in resistance temperature sensor with HART
The Müller programmable temperature switch/ output transmitter also features HART comms for use in a whole range of industrial applications. With its two configurable limit value contacts, the integrated display & the numerous electrical connections, the temperature sensor is also suitable for applications where there is only one process connection available combining display, switch, transmitter in one compact instrument.
Prices start at £325.00 depending on the insertion length of the sensor (pricing based on 100 mm sensor) and for this month all new enquiries will automatically have a 15% discount applied.
Company News
Our incredible team are getting together on the 31st July 2021 to raise money for Macmillan. We will be walking 26 miles to support Macmillan nurses & care teams for all they do. Each team member has sadly been effected by cancer therefore its a cause close to our hearts.
This walk will be in honour of Katherine. Read more about our stories & please donate via our Just Giving page.
Treatt Update
Process Instruments have been working on the New Treatt development based at Suffolk business Park from September 2020, providing high quality instrumentation. We’ve supplied Burkert automated & manual valves of which majority have been delivered & installed. The same is true of the tank farm Siemens SIWAREX load cells.
The Siemens instrumentation for phase 1 is also being delivered from our off site storage facility to site as & when called for by the project engineers.
We have assisted a variety of addition & a major re-tagging exercise recently. The whole project is on track to be completed in the allotted time.
Check out our full article speaking with Emmet O’Sullivan, Account Manager about the project.
Team Update
Mike Cardy our finance Manager is currently undertaking a Senior Leaders Master’s Degree Apprenticeship with The Chartered Management Institute. As part of his course he is undertaking an MBA with the University of Kent. Mike has just completed the final module of the MBA, of which he is currently on track to complete with distinction. “I still have work to do to complete the apprenticeship & gain chartered manager status, the highest status that can be achieved in the management & leadership profession.”
To achieve the MBA he needs to undertake & document projects within the workplace & evidence that what he has learnt has benefitted the company.
“From a personal view, I have loved the MBA & it has genuinely been an eye opening & inspiring experience. I have learnt so much & despite the huge amount of work & stress, I’d do it all over again if I had the chance.”